Skip to main content

APPLICATION OF QUALITY CONTROL IN NIGERIA INDUSTRIE

ATTENTION:

BEFORE YOU READ THE ABSTRACT OR CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU!

 

INFORMATION:

YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N10,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420

 

                       

 

APPLICATION OF QUALITY CONTROL IN NIGERIA INDUSTRIES

                                       

ABSTRACT

It is generally believed that Nigeria are not satisfied with goods made in their country but are rather attracted to foreign made products. This state of affair attributed to the poor quality of products. This study seek to examine the various method used by different manufacturing organizations and also assess the effectiveness of the applications.

To achieve this objectives, a survey of Michelin Nigeria Limited, one of the manufacturing organization in Port Harcourt was undertook. A review of related literature was also undertaken. A sample survey techniques was developed and administered to the various Michelin manufactured products.

From the analysis of data collected, it was found that the application of quality management techniques ensure high quality products and that the two Michelin products were under control.

The analysis is such that will construct the statistical quality control chart for the products, the production process should continue.

It also recommend the maintenance of the machine should be encouraged by the management of every department rather than allowing the machines to go bad before maintenance can be checked.

 

Table of Contents:

TABLE OF CONTENTS

 

Title page  ii

Approval page    iii

Dedication iv

Certification        v

Acknowledgement       vi

Abstract     vii

Table of contents         xii

CHAPTER ONE

Introduction        1

1.1    Background of the study      1

1.2    Statement of the problem   7

1.3    Scope and limitation 0f the study 8

1.4    Justification of study   10

1.5    Relevant of study        10

1.6    Objectives of the study        11

CHAPTER TWO

2.1    Review of literature     12

2.2    Responsibility for quality     14

2.3    Customer responsibility       16

2.4    Supplier responsibility 16

2.5    The manufacturer        17

2.6    Policies of quality        17

2.7    Motivation for quality 20

2.8    Quality circle      22

2.9    Inspection  23

2.10  Where to inspect         24

2.11  How to inspect   25

2.12  Acceptance sampling  26

2.13  Attributes sampling plan      28

2.14  Variable sampling plan         29

CHAPTER THREE

Research methodology        30

3.1    Source of data    30

3.2    Population of study     31

3.3    Sampling procedure    31

3.4    Systematic random sampling        32

3.5    Data collection instrument  32

3.6    Data analysis technique       33

3.7    Presentation data        35

3.8    Definition of terms      36

CHAPTER FOUR:

Presentation and analysis of data 37

4.1    Introduction        37

4.2    Examination of research sample data 38

4.3    General analysis of sample data   38

CHAPTER FIVE

Findings recommendations and conclusion   45

5.1    Introduction        45

5.2    Findings     45

5.3    Conclusions         46

5.4    Recommendation        47

References          49

HOW TO GET THE FULL PROJECT WORK

 

PLEASE, print the following instructions and information if you will like to order/buy our complete written material(s).

 

HOW TO RECEIVE PROJECT MATERIAL(S)

After paying the appropriate amount (#10,000) into our bank Account below, send the following information to

08068231953 or 08168759420

 

(1)    Your project topics

(2)     Email Address

(3)     Payment Name

(4)    Teller Number                     

We will send your material(s) after we receive bank alert

 

BANK ACCOUNTS

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 0046579864

Bank: GTBank.

 

OR

Account Name: AMUTAH DANIEL CHUKWUDI

Account Number: 2023350498

Bank: UBA.

 

 

 

FOR MORE INFORMATION, CALL:

08068231953 or 08168759420

 

 

AFFILIATE LINKS:

myeasyproject.com.ng

easyprojectmaterials.com

easyprojectmaterials.net.ng

easyprojectsmaterials.net.ng

easyprojectsmaterial.net.ng

easyprojectmaterial.net.ng

projectmaterials.com.ng

googleprojectsng.blogspot.com

myprojectsng.blogspot.com.ng

https://projectmaterialsng.blogspot.com.ng/

https://foreasyprojectmaterials.blogspot.com.ng/

https://mypostumes.blogspot.com.ng/

https://myeasymaterials.blogspot.com.ng/

https://eazyprojectsmaterial.blogspot.com.ng/

https://easzprojectmaterial.blogspot.com.ng/

 

 

 

 

 


Comments

Popular posts from this blog

KNOWLEDGE AND PERCEPTION OF HYPERTENSION AND IT’S MANAGEMENT AMONG CLIENTS/PATIENTS

ATTENTION: BEFORE YOU READ THE CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU! INFORMATION:        YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420 KNOWLEDGE AND PERCEPTION OF HYPERTENSION AND IT’S MANAGEMENT AMONG CLIENTS/PATIENTS ABSTRACT Hypertension is an important public health challenge at Auchi Nigeria. The purpose of this qualitative phenomenological survey was to determine hypertensive patients’ knowledge, perceptions, attitudes and life-style practices so as to optimize their health and treatment needs. We examined a cohort of 108 randomly selected hypertensive by means of a self-structured questionnaire and a detailed interview. Analysis was by statistical package for social sciences (SPSS) and chi- squa...

THE STATE OF THE ART ASSESSMENT OF EDUCATIONAL RESOURCE PROVISION AND CONTROL

ATTENTION: BEFORE YOU READ THE CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU! INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420 THE STATE OF THE ART ASSESSMENT OF EDUCATIONAL RESOURCE PROVISION AND CONTROL ABSTRACT The study investigates and assesses the provision and control of educational resources and its effect on students’ academic performance in Lagos education district II. The study was a descriptive survey of correlation type. The sample of respondents for the study comprised of male and female principals and teachers in all the sampled schools for the study. However, simple random sampling procedure was adopted to select twenty-five (25) respondents (principals and teachers) from each school, making a total of One Hundred and ...

RELATIONSHIPS AMONG PEER PRESSURE, TIME MANAGEMENT AND ACADEMIC PERFORMANCE OF IN-SCHOOL ADOLESCENTS

ATTENTION: BEFORE YOU READ THE CHAPTER ONE OF THE PROJECT TOPIC BELOW, PLEASE READ THE INFORMATION BELOW.THANK YOU! INFORMATION: YOU CAN GET THE COMPLETE PROJECT OF THE TOPIC BELOW. THE FULL PROJECT COSTS N5,000 ONLY. THE FULL INFORMATION ON HOW TO PAY AND GET THE COMPLETE PROJECT IS AT THE BOTTOM OF THIS PAGE. OR YOU CAN CALL: 08068231953, 08168759420 RELATIONSHIPS AMONG PEER PRESSURE, TIME MANAGEMENT AND ACADEMIC PERFORMANCE OF IN-SCHOOL ADOLESCENTS Abstract   The study sought to investigate the relationships among peer pressure, time management and academic performance of in-school adolescents in Delta-State. In pursuance of the aforementioned objectives, six research questions were posed and one hypothesis postulated. Subjects for the study consisted of 600 in-school adolescents from the three Senatorial Zones in Delta-State. They were composed using random sampling technique. The instrument used for data collection used was a researcher made Questionn...